Avo › Invoice templates › Construction Invoice Template

Construction Invoice Template (Free Fillable PDF)

Construction invoices differ from a normal service invoice in three ways: the job is billed in stages, the client often holds retainage, and the paperwork has to survive a dispute. This template covers all three without turning into a 12-page pay application.

Download the free PDF templateOr make it in the Avo app

Free, fillable, US Letter. No email, no sign-up. Use it for progress invoices (“Invoice 3 of 5 — rough-in complete”), for the final invoice that releases retainage, and for change orders billed separately.

What the PDF looks like. The hints in the line table show the lines a construction company typically bills; type over them.

Why construction invoices get paid late

Progress invoices that don't add up

If invoice 3 doesn't show what was billed on 1 and 2, the client's bookkeeper will stop everything to reconcile. Show contract total, previously billed, this invoice and balance remaining.

Retainage confusion

Retainage withheld but not shown on the invoice is the most common reason a construction payment is short. Make it a visible line.

Change orders mixed into base scope

A change order billed inside the original lines looks like overbilling. Give it a line with the approval date.

What to include on a construction invoice

Example construction invoice

Lines a typical job produces. Labor and materials are separate, and anything already paid is a negative line so the total is the balance due.

DescriptionQty × rateAmount
Phase 2 — Foundation (100% complete)1$18,400.00
Phase 3 — Framing (60% complete)0.6 × $24,000$14,400.00
Change order #2 — relocate drain, approved 09 Apr1$2,150.00
Less retainage held (10%)−$3,495.00
Less previously billed−$18,400.00
Total due$13,055.00

How to use the template

  1. Download the PDFIt is a fillable form: open it in any PDF reader, on a computer or a phone.
  2. Fill in your details onceBusiness name, contact, license number, terms. Save it as your master copy.
  3. Add the job and sendChange the client, the lines and the invoice number for each construction company job. Export and send by email or text.

Fill it on your iPhone in a minute instead

Avo keeps your clients and your usual line items, so the next invoice is three taps. Your first three documents are free, full-quality PDF, no watermark. Premium from $59.99/year if you invoice often.

Download Avo on the App Store

Questions

What is the difference between a construction invoice and a pay application?

A pay application (AIA G702/G703 style) is a formal schedule-of-values document required by some general contractors and lenders. A construction invoice is the simpler version most subcontractors and residential builders use. This template is the invoice; its summary block carries the same numbers a pay app would.

How do I invoice for a percentage of work completed?

Multiply the line's contract value by the percentage complete, subtract what was billed on earlier invoices, and show both numbers. The sample above does exactly that for framing at 60%.

How should retainage appear?

As a negative line on each progress invoice (“Less retainage held, 10%”), and as a positive line on the final invoice (“Retainage release”).

Can a change order be on the same invoice as base work?

Yes, as a separate line with its own number and approval date. Never fold it into a base-scope line.

Do I need a lien waiver with every invoice?

Not legally everywhere, but many clients and all lenders expect a conditional waiver with the invoice and an unconditional one after payment. Mentioning it on the invoice avoids a follow-up email.

Templates for related trades

Contractor Invoice TemplateElectrician Invoice TemplatePlumbing Invoice TemplateHVAC Invoice TemplateIndependent Contractor Invoice Template

Guides

How to Fill Out an InvoiceInvoice Email TemplateInvoice TrackerSample Invoice PDF