Electrical invoices have to be precise because the work is inspected and because materials add up: breakers, wire by the foot, boxes, devices. This template lists materials by item with quantities, keeps the permit fee separate, and has room to note the circuit or panel that was worked on.
Free, fillable, US Letter. No email, no sign-up. Use it for a service call, a panel upgrade billed in two stages, or an EV charger install with a permit.
What the PDF looks like. The hints in the line table show the lines a electrician typically bills; type over them.
“Materials — $410” is questioned; “12/2 NM-B 250 ft, 20A AFCI breaker × 2, boxes and devices” is paid.
Show it at cost with the permit number so the customer knows it went to the city.
The extra outlet the homeowner asked for while you were there gets its own line with “added on site” in the description.
Lines a typical job produces. Labor and materials are separate, and anything already paid is a negative line so the total is the balance due.
| Description | Qty × rate | Amount |
|---|---|---|
| Service call | 1 | $75.00 |
| Install 240V/50A circuit for EV charger, garage | 4 h × $110.00 | $440.00 |
| 6/3 NM-B cable | 40 ft × $4.20 | $168.00 |
| 50A 2-pole breaker, NEMA 14-50 receptacle, box | 1 lot | $96.50 |
| Electrical permit #E-26-0419 (at cost) | 1 | $120.00 |
| Total due | $899.50 | |
Avo keeps your clients and your usual line items, so the next invoice is three taps. Your first three documents are free, full-quality PDF, no watermark. Premium from $59.99/year if you invoice often.
Not every screw, but every item a customer could price: breakers, devices, wire by the foot. Small hardware can be one “boxes, connectors, hardware” line.
Two invoices or two sections: deposit invoice for equipment on order, final invoice after inspection. Reference the permit number on both.
Pass it through at cost and say so. If you charge for the time to pull the permit and meet the inspector, make that a labor line.
Add it as its own line marked “added on site, approved by [name]”. The original quote still reconciles and the customer remembers asking.
Yes; add the PO number and the client's job number in the header, and use Net 30 terms.